ARMY TM 10-1670-294-23&P
AIR FORCE T.O. 13C5-33-2
NAVY NAVAIR 13-1-34
o.
Closing Deployment Bag
(1)
Lift deployment bag and stand on end.
(2)
Lay bag on floor with mouth of bag and stowed suspension lines toward tension device.
(3)
Position the taped suspension line connector links in the upper center of the stowage panel
next to the canopy skirt. Insure that the adapter web extends from the left side of the bag
(figure 2-28).
Figure 2-28. Suspension Lines Prepared for Rollup.
(4)
Tightly roll the suspension line stowage panel while lifting the bag to upright position and tuck
into the mouth of the deployment bag (figure 2-29).
(5)
Fold the adapter web lengthwise from left to right across the rolled suspension line stowage
panel.
(6)
Use a suitable length of 1/4-inch cotton webbing, Install a temporary bag closing tie (hourglass
tie) using the four bag closing loops. Secure with a surgeon's knot and a locking knot (figure 2-
30).
2-41