TM 10-1670-296-20&P 0003 00
0003 00-6
3. Modification Work Order (MWO) Compliance Record Page. When a modification is performed on an
item, the following entries will be made on the Modification Work Order Compliance Record pages
of the Log Record.
a. MWO Number. Enter publication number and date of Modification Work Order (MWO) that
describes MWO (Item 1, Illustration on following page).
b. MWO Title. Enter a short, abbreviated title extracted from the MWO prescribing the work.
c. Modified By. Enter the last name of the individual who has performed the modification. If the
original log record for the item has been lost, and it has been ascertained through inspection that
a particular modification has been accomplished, the entry for this column will be C/W,
COMPLIED WITH (Item 2, Illustration below), which signifies the applicable MWO has been
complied with.
d. Inspected By. The individual who accomplished the inspection required after modification will
sign this entry with their last name only.
e. Unit. Enter the unit designation responsible for performing the MWO or in the event of a lost Log
Record, the unit to which the inspector is assigned.
f.
Date. Enter the date (day, month, and year) the modification work was completed.
4. Unit and Direct Support Repair and Inspection Data. When an item is initially received from a supply
source and a technical/rigger-type inspection is performed, the inspection accomplishment will be
documented on the Unit and Intermediate Repair and Inspection Data page of the individual
Parachute Log Record. Additional entries will also be made on this page each time the item is
repaired or is administered an inspection in compliance with a Maintenance Advisory Message
(MAM) or Ground Precautionary Message (GPM). The page completion criteria is as follows:
a. Type of Repair. Enter the type of repair, completion of initial inspection, repair accomplishment,
or MAM or GPM compliance.