2-15. EXTENSION, STATIC LINE.
This task covers:
a. Inspect
c. Repair
b. Replace
d. Install
INITIAL SETUP
Tools:
Knife, Item 1, Section III, Appendix B
Shears, Item 2, Section III, Appendix B
Materials/Parts:
Cord, Nylon, OD nylon core, Type III, Item 9, Appendix D
Thread, nylon, size 6, Item 39, Appendix D
Wire, Steel, Item 60, Appendix D
General Safety Requirements:
Read, understand, and follow all warnings, cautions, and notes.
Equipment Condition:
Static line extension removed from static line. Position on work table in extended position. Extension must be clean and
dry.
INSPECT
Perform a before and after repair rigger/technical inspection of the static line extension as outlined in paragraph 2-14.
REPLACE
Remove the 5 foot long static line extension (1) from the 15 foot static line (2). Replace damaged safety pin (3) or
lanyard (4) as described in the repair procedures. If the extension is unserviceable because of frays, cuts, worn areas or
other defects in the fabric that can not be repaired by restitching, replace the extension with a serviceable item from
stock.