TM 10-1670-327-23&P
0032 00
REPLACE - continued
4
1
3
2
Figure 6. Routing Control Line Through Channel, Guide Ring, and Toggle.
7. Push the toggle (figure 7, item 1) up past the 282 inch mark (figure 7, item 2) and tie two overhand
knots (figure 7, item 3) on top of each other, below the toggle, such that the yellow mark (282 inch
mark) is located in the center of the first knot.
1
2
3
Figure 7. Tying First Two Overhand Knots.
8. Leave a gap of about 2.5 inches (3 fingers width) and tie another overhand knot (figure 8, item 1).
1
Figure 8. Tying Final Overhand Knot.
END OF WORK PACKAGE
0032 00-5/(6 Blank)