• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2-48.  Completing Second Stow
Figure 2-51.  Completing Second Regular Stow

TM-10-1670-271-23P Parachute Personnel Type: 35-Foot Diameter T-10B Troop Back Parachute Assembly NSN 1670-00-091-0720 Manual
Page Navigation
  64    65    66    67    68  69  70    71    72    73    74  
ARMY TM 10-1670-271-23&P AIR FORCE TO 14D1-2-464-2 MARINE CORPS TM 01136B-23&P/1 Figure 2-49.  Forming First Regular Stow (10)  Using a stow hook, make the first regular stow in the upper right stow loop (figure 2-50). (11)  Rotate deployment bag one-quarter turn clockwise. (12  Grasp suspension lines approximately the width of the deployment bag and sliding the bag on the table, form the second regular stow in the upper left corner of the bag. (13)  Using stow hook, make second regular stow In upper left corner (figure 2-51). (14)  Continue alternating stows from right to left until approximately 8 to 10 inches of suspension lines are left unstowed (figure 2-52). NOTE There should be a minimum of 8 stows on each panel. (15)  Remove the connector links from the tension plate. (16)  Fold the excess slack from the remaining suspension lines over the stowed suspension lines. 2-59







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.