• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Folding the gores and reefing the canopy cont. - TM-10-1670-280-23P_174
Tying the canopy assembly cont. - TM-10-1670-280-23P_176

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  146    147    148    149    150  151  152    153    154    155    156  
TM 10-1670-280-23&P                                                       0013 00 0013 00-19 aa. Trim each tie end at a point 2-inches from the surgeon’s knot and locking knot.   bb. Rigger check number 2.   NOTE It is 48-feet from the lower lateral band to the upper lateral band.  It is not necessary to install a 9th canopy tie. NOTE Ensure all ties are tight. 7.    Tying the canopy assembly.  To tie the canopy assembly, release tension, remove the tension device and tie the canopy assembly as follows: a.    Folded canopy.    (1)  Beginning at a point 5-foot above the skirt band (lower lateral band) and at 5-foot intervals thereafter, install the eight canopy ties.    (2)  Tie the canopy folds using one turn single, ticket No. 8/4 cotton orange thread at each point.    (3)  Secure each tie with a surgeon’s knot and locking knot.    Line 1 2nd Reefing Line 4th Reefing Line







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.