• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Folding the gores and reefing the canopy - TM-10-1670-280-23P_76
Completing center line installation - TM-10-1670-280-23P_78

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  48    49    50    51    52  53  54    55    56    57    58  
TM 10-1670-280-23&P                                                       0011 00 0011 00-17 o.    While holding line 60 in position in the line separator, pick up the left suspension line group and throw the left group of gores and lines over the folded right group of gores and lines. p.    Beginning with line 59, one packer passes each line in the left group to a second packer who threads the left running end of the reefing line through each reefing ring.  After each reefing ring is threaded, the second packer will use a leg to guide the suspension line into the left slot of the line separator.   Continue the gore folding process until lines 60 through 31 are reefed and in the left slot of the line separator and the gores between each line are folded. q.    Stop the gore folding process and from left to right, pass the end of the third reefing line through the reefing line at line 31 and pull 6-inches through. r. Pass one end of the fourth reefing line, from right to left, through the hole in the reefing line cutter at line 31 and pull 6-inches through. s.     Secure the two reefing line ends together over the reefing line cutter at line 31 with a surgeon’s knot and locking knot.  Make an overhand knot in each running end.  Trim each tie end at a point 2-inches from the surgeon’s knot and locking knot.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.