• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Folding the gores and reefing the canopy - TM-10-1670-280-23P_77
Completing center line installation cont. - TM-10-1670-280-23P_79

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  49    50    51    52    53  54  55    56    57    58    59  
TM 10-1670-280-23&P                                                       0011 00 0011 00-18 t. Using the gore folding procedures in (o), fold the gores and reef the canopy skirt between lines 31 and 1 until the left group of gores are folded and lines 60 through 1 are in the left slot of the suspension line separator. u.    From left to right, pass the end of the fourth reefing line through the hole in the reefing line cutter at line 1 and pull 6-inches through. v.     From right to left, pass the end of the second reefing line through the hole in the reefing line cutter at line 1 and pull 6-inches through. w.   Secure the two reefing line ends together over the reefing line cutter at line 1 with a surgeon’s knot and locking knot.  Make an overhand knot in each running end.  Trim each tie end at a point 2-inches from the surgeon’s knot and locking knot.    CAUTION When installing the center line, ensure that it is not entangled or wrapped around the suspension lines or suspension risers. 7.    Completing center line installation. a.    Disconnect the bridle loop from the stationary post and dress the upper lateral band making sure the vent lines are centered and separated.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.