• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Tying the canopy assembly - TM-10-1670-280-23P_81
Tying the canopy assembly cont. - TM-10-1670-280-23P_83

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  53    54    55    56    57  58  59    60    61    62    63  
TM 10-1670-280-23&P                                                       0011 00 0011 00-22 (5)    Beginning at a point 10-feet below the skirt band (lower lateral band) and at 10-foot intervals thereafter, tie both suspension line groups and center line together using one turn single, ticket No. 8/4 cotton orange thread at each point. Secure each tie with a surgeon’s knot and locking knot.  Make the last tie 5-feet above the connector link assemblies.  Trim all tie ends to 2-inches.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.