• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Arming the reefing line cutters.
Installing reefing line cutter safety ties - TM-10-1670-280-23P_89

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  59    60    61    62    63  64  65    66    67    68    69  
TM 10-1670-280-23&P                                                       0011 00 0011 00-28 g.    Trim each tie end at a point 2-inches from the surgeon’s knot and locking knot. h.    On the left side of the deployment bag, arm the reefing line cutter at line 31, pass the end of one of the cords through the hole in the top of the reefing line arming cable and through the lower grommet located on the left side of the deployment bag. i. Pass the other end of the cord through the top grommet and draw the cord ends tight.    j. Secure the cord ends on the bag outside with a surgeon’s knot and locking knot.    k.     Make an overhand knot in each running end.    l. Trim each tie end at a point 2-inches from the surgeon’s knot and locking knot. m.   On the right side of the deployment bag, arm the reefing line cutter at line 91, pass the end of one of the cords through the hole in top of the reefing line arming cable and through the lower grommet located on the right side of the deployment bag. n.    Pass the other end of the cord through the top grommet and draw the cord ends tight.    o.    Secure the cord ends on the bag outside with a surgeon’s knot and locking knot.    Arming Cable Tie







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.