TM 10-1670-265-12&P
T.O. 13C7-1-21
4-18. ASPSU - ALINE
4-18
This task covers: Alinement
General Safety Instructions:
INITIAL SETUP
WARNING
Test Equipment:
Always insure that the ASPSU test set is
ASPSU test set FLT4240
depressurized before attempting to open chamber
door as personnel injury may result.
Tools;
Rigger's knife NSN 5110-00-162-2205
WARNING
Screwdriver, cross tip NSN 5120-00-234-8912
The altitude sensor parachute staging unit (ASPSU)
Screwdriver, plane tip NSN 5120-00-979-4557
contains a class C explosive in the cutter
Personnel Required:
mechanism of the cutter module. Procedure steps
43E (10) Parachute rigger
shall be followed to prevent early activation and
possible personnel injury.
Reference Information:
TM 10-1670-266-13&P
NOTE:
TB 750-126
The instructions pertain to the functional group
number sequence 02 in the MAC and RPSTL.
Equipment Conditions:
External power of ASPSU test set must be connected to
115 VAC @ 60 5 Hz
Special Environmental Conditions:
Temperature: Room Ambient, 70 10
F
F
(22 44 )
C
C
Humidity: Room Ambient, 55% normal
GO TO NEXT PAGE
4-32