4-18. ASPSU - Aline (Cont)
4-18
ALINEMENT (Cont)
NOTE
The following step-by-step instructions cover the alinement of the ASPSU. However, if you have
been performing an operational test and have been referred to this paragraph for an alinement,
you are to proceed from step 4 below.
1.
Test set preparation.
a.
Electrical hookup. Remove and connect the 115 VAC power cable in the ASPSU test set in accordance with
TM 10-1670-266-13&P.
NOTE
Insure that all test set switches are in the OFF or DOWN position.
b.
Raise the pressure chamber door.
c.
Check fuses and lights in accordance with TM 10-1670-266-13&P.
GO TO NEXT PAGE
4-33