TM 10-1670-265-12&P
T.O. 13C7-1-12
4-21. G-12E - SERVICE (Cont)
4-21
PACKING (Cont.)
9.
Tying the connector link assemblies (cont).
d.
Remove the taped cotton webbing from the nylon webbing strap. Remove and discard the tape.
e.
Stack each of the two groups of connector link assemblies.
f.
S-fold the slack in the center line between the two stacks of connector link assemblies.
g.
Pull the two connector link groups together against the S-folded center line with the webbing length ends.
h.
Secure the webbing ends on the top center of the link assemblies groups with a surgeon's knot and a locking
knot. Trim tie ends to 2 inches.
i.
All canopy assembly ties are now completed.
GO TO NEXT PAGE
4-63