TM 10-1670-265-12&P
T.O. 13C7-1-12
4-21. G-12E -SERVICE (Cont)
4-21
PACKING (Cont.)
12. Stowing the suspension lines, center line, and risers (cont).
d. Stowing lines and risers (Cont.)
(7) Stow the risers and remaining lines to a point 18-inches from the clevis. An S-fold is not made in the
last stow.
(8) Trim all the webbing ends to 2-inches.
GO TO NEXT PAGE
4-77