TM 10-1670-265-12&P
T.O. 13C7-1-12
4-21. G-12E -SERVICE (Cont)
4-21
PACKING (Cont.)
13. Closing the deployment bag.
a. Securing the suspension line stowage flap.
(1) Remove the two cluster attaching straps securing the suspension line stowage flap at the bottom of the bag.
(2) Riggers number 1 and 2, positioned on each side of the bag, roll the stowage flap.
GO TO NEXT PAGE
4-78