TM 10-1670-268-20&P 0004 00
0004 00-22
(2)
With the suspension sling attached, the platform may be lifted and turned over. Two straps
should be attached to the opposite two corners of the platform to guide the platform as it is
being raised.
(3)
Once the platform is turned upright, it should be placed on the supporting structure,
allowing access to the bolts in the outboard side of the outboard roller pad.
f.
Installation of Outrigger Weldment Assembly. Two personnel are required for this task. Install a
Outrigger Weldment Assembly on the platform as follows:
(1)
Position weldment so that the 2 bolt-holes at each end match up with bolt-holes on the link.
(2)
Install ½-inch diameter x 4½-inch bolts, inserting bolts from the outside of the link. Use a
flat washer under bolt head and nut. Tighten the bolts two or three turns by hand.
(3)
Pass a 3/8-inch diameter by 4-inch bolt through 2-inch diameter by ¼-inch thick jumbo
washer. Perform alignment check by passing bolt through weldment bolt-hole and
corresponding platform panel bolt-hole from top to bottom.
WELDMENT
ASSEMBLY
LINK
ASSEMBLY
WELDMENT
BOLT HOLE