ARMY TM 10-1670-276-23&P
AIR FORCE T.O. 13C5-29-2
NAVY NAVAIR 13-1-29
Figure 2-7. Shakeout
b. Airing. Where dampness and mildew are prevalent, air delivery equipment will be aired at frequent intervals
according to the severity of the prevailing conditions. Parachutes that have been previously packed or are
unpacked, which have been subjected to conditions of dampness or mildew, will be aired for a period of at least 6
hours prior to being repacked. Air delivery items may be aired either indoors or outdoors in dry weather. However,
fabric items will not be aired In direct sunlight Airing may be accomplished by suspending or elevating the
applicable item(s) In a manner which would allow entire exposure to the circulation of air. Outside facilities used
tor the shakeout of parachutes may be used for the airing of air delivery equipment if weather conditions permit If
the shakeout facilities are inadequate for airing, the applicable item(s) may be suspended or elevated at several
points or by draping over suitable type objects which would not cause damage.
2-13
