TM 10-1670-277-23&P 0011 00
0011 00-13
NOTE
If parachutes are PACKED FOR CONTINGENCY, in lieu of the rubber
retainer bands, one turn single, thread, cotton, ticket 8/7 will be used to
secure the suspension lines to the lines to the stowage flap stow loops.
c. Beginning at upper right inside corner of deployment bag, stow canopy in the bag with S-fold.
d. Upon completion of canopy stowage, suspension lines should extend from left side of the bag open
end.
e. Fold suspension lines from left to right across skirt of canopy.
f.
Using one turn double ticket 8/7 cotton thread, secure top and bottom center bag, tie loops together
by passing one thread end through bottom center tie loop from right to left, under suspension line
fold, through the top center, tie loop from left to right and join thread ends on top of the suspension
line fold with a surgeons knot and a locking knot. Trim tie ends to 2-inches.