TM 10-1670-277-23&P 0011 00
0011 00-17
f.
Fold extended adapter web from left to right across rolled suspension line stowage flap.
g. Using a length of ¼-inch cotton webbing, make left bag closing tie by passing one end of webbing
through left bottom bag closing loop from right to left, up behind adapter web, through top bag closing
loop from left to right, secure ends together over adapter web, with a surgeons knot and a locking
knot. Trim tie ends to 2-inches.
h. Using a length of ¼-inch cotton webbing, make right bag closing tie by passing one end of webbing
through right bottom bag closing loop from left to right, up behind adapter web, up through right side
bag grommet, through right bag closing loop from right to left, secure ends together over adapter
web, with a surgeons knot and a locking knot. Trim tie-ends to two-inches.
i.
Rigger check number 6.
j.
Pull deployment bag safety cord up over bent V-ring.
k. Secure safety cord by passing the pendulum line running end through the V of V-ring, draw the
pendulum line tight, make additional loops between V-rings as required and secure pendulum line
with a half-hitch.