TM 10-1670-277-23&P 0011 00
0011 00-22
v. Rigger check number 2.
2. Long fold.
a. Beginning with panel/section number 1, fold first six sections of right group of gores over radial seam
36 and fold left group over the right group.
b. Place packing weights of folded panel/sections to hold the folds in position. Ensure longfold does not
exceed width of deployment bag.
3. Rigger check number 3.
4. Attaching the canopy break cord tie. Attach the canopy break cord tie IAW procedures in WP 0004 00,
ASSEMBLY OF THE 28-FOOT DIAMETER CARGO EXTRACTION PARACHUTE.
5. Stowing the canopy.
NOTE
An assistant packer will be required to ensure proper stowing of canopy.
a. Wrap each suspension line connector link with two-inch wide, pressure sensitive adhesive cloth tape.
Start at a point one-inch above the connector link and end at a point one-inch below the connector
link. Wrap the tape twice around the entire length.
b. Before stowing the canopy, install a sufficient number of double, 28-inch, type I, ¼-inch cotton
webbing girth hitch ties at equal intervals along the suspension line stowage flap stow loops.
