ARMY TM 10-1670-278-23&PAIR FORCE T.O. 13C5-26-2NAVY NAVAIR 13-1-272.34. Deployment Bag Grommet.This task covers:a. Repairb. ReplaceTools:Personnel Required:Cutter, Single Bow, Item 22, Appendix B43E(10) Parachute Rigger.Mallet, Rawhide, Item 5, Appendix BSet Chuck and Die, Item 11, Appendix BEquipment Condition:Sewing Machine, Medium Duty, Item 15Appendix BInspected, Paragraphs 2-9 and 2-13Cleaned, Paragraph 2-12Materials/Parts:Cloth, Nylon, Duck, 7.2 Oz, Item 6,Reference:Appendix DThread, Nylon, Size E, Item 27, 29,Group No. 02, MAC, Section II, Appendix BAppendix Da. Repair. Repair grommet as follows:(1) Remove burrs, rough spots, rust, or corrosion from an Installed grommet by filing with a file or by buffing witha crocus cloth.(2) Reseat a loose grommet using the procedures listed in paragraph b.(3) If fabric area around original grommet has been damaged, repair area by darning using procedures inparagraph 2-18. If darning does not provide an adequate repair, construct a 2 3/4- by 2 3/4-inch sizedreinforcement cloth and fold under 1/2-inch on all sides. After removing original grommet (paragraph b., step1) sew cloth to inside with size E nylon thread, 7 to 11 stitches per inch, one row of stitches 1/8-inch fromoutside edge and the second row 3/8-inch from outside edge (figure 2-52). After reinforcing damaged areacut new hole for grommet installation.2-91
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business