ARMY TM 10-1670-278-23&P
AIR FORCE T.O. 13C5-26-2
NAVY NAVAIR 13-1-27
2-32. Connector Link (cont).
Figure 2-50. Connector Link Assembly.
(4) If required, pass remaining L-bar of replacement link through attaching loop of adjoining component.
(5) Fit replacement link L-bars together and ensure L-bar leg engagement by tapping end of each L-bar with a phenolic
mallet.
(6) As applicable, trace suspension lines from connector link assembly to canopy to ensure lines are properly installed
and in correct sequence.
(7) Replace locking screws and tighten with a flat screw driver.
2-88