ARMY TM 10-1670-279-23&P
AIR FORCE T.O. 13C5-27-2
NAVY NAVAIR 13-1-28
(k)
Turn the canopy right side out and trim the raw edges of the section material to a point 1/2 inch
from the stitching made in j, above.
(I)
On the canopy outside, using a light duty sewing machine and size E, nylon thread, stitch
completely around the prepared area. Stitching will be 7-11 stitches per inch.
(m) Remove basting, reinvert canopy to outside.
(n)
Restore items removed in (b) above. Refer to applicable paragraph for detailed instruction.
Figure 2-39. Gore Panel Replacement Details.
2-73