TM 10-1670-287-23&P
0008 00
0008 00-2
NOTE
Parachutes that are deemed unserviceable, by a packing or rigging
activity, will be rigger-rolled (see the ACCORDION FOLDING/
RIGGER ROLLING paragraph detailed in WP 0061 00) prior to
being sent to a repair activity.
Table 1. Preventive Maintenance Checks and Services
X Before and after all repairs, and
before packing (technical/rigger
type inspection).
Y After use (shakeout).
Z Prior to issue (routine
inspection).
Interval
ITEM
NO.
X
Y
Z
ITEM TO BE
INSPECTED
PROCEDURES
00
MC-4 System
01
Parachute
(Packed for Use)
Check for serviceability and completeness of visible parts
without opening container. Pack date in parachute log
record.
02
Canopies and Riser
Assemblies
Check for dampness, fungus, acid, grease, oil, foreign
material, holes, cuts, tears, and broken lines as canopy is
raised, lowered, and suspended during shakeout.
03
Canopy Fabric
Materials
Check for legibility and completeness of marked data;
dampness, fungus, dirt, acid, grease, oil, foreign material,
rips, burns, cuts, breaks, frays, tears, holes, and loose or
broken stitching on fabric and lines.
04
Hardware
Check for corrosion, rust, rough spots, burrs, breaks,
cracks, bends, and stripped or damaged threads.
05
Risers
Check for dampness, fungus, acid, grease, oil, dirt,
foreign material, cuts, tears, and frays.
06
Riser Fabric
Materials
Check for dampness, fungus, dirt, acid, grease, oil,
foreign material, burns, cuts, tears, broken or loose
stitching, excess line keepers, reserve static line release
lanyard, main canopy release locking loop, and riser
release rings.
07
Riser Hardware
Check for corrosion, rust, rough spots, burrs, breaks,
cracks, bends, and stripped or damaged threads.
08
Pilot Parachutes
Check for dampness, acid, grease, oil, and dirt, foreign
material, and broken springs.
