TM 10-1670-287-23&P
0006 00
0006 00-23
NOTE
Ensure the knot is drawn tight against the toggle ring.
21. Permanently secure control line knot formed below. Trim the running end to the length of the toggle.
SPANWISE LINE CHECK
Perform spanwise line check as follows:
1. Lay out parachute on a clean dry surface with canopy positioned on its left side. Leading edge (nose)
will be on right when viewed from riser end. Stretch lines full length with a helper positioned at riser
end to check continuity and to hold lines taut.
Control Line
Overhand Knot
Rear Riser
Ring
Toggle