TM 10-1670-287-23&P
0014 00
0014 00-32
2. Rotate deployment bag and suspension lines over container. Position risers along sides of reserve
parachute container, continuing along sides of main container, with control toggles facing inward.
3. Position deployment bag and suspension lines into container. Position suspension lines so they face
bottom of main parachute container. Route bridle line out over reserve chute.
Risers
Deployment Bag
Bridle Line
Deployment Bag