TM 10-1670-287-23&P
0037 00
0037 00-9
(3)
On the 3-inch length, fold ends under ½-inch and sew with a light-duty sewing
machine, type 301, and size E nylon thread, 7 to 11 stitches per inch. Backstitch
not less than 1/2-inch.
(4)
With raw edges inside, fold in half, lengthwise. Join folded fabric together using
¾-inch green nylon binding tape. Equal the excess length of binding tape on both
ends of the sleeve. Sew one (1) row with a light-duty sewing machine, type 301,
and size E nylon thread, 7 to 11 stitches per inch. Backstitch not less than 1/2-
inch.
(5)
On the AR2 power cable sleeve, make a mark 1-inch and 7 ½-inches from the
TOP end of the sleeve.
NOTE
Prior to installing the AR2 power cable sleeve, the main and
reserve parachutes must be completely unpacked.
(6)
Position harness/container assembly on work surface with pack tray facing down
and AR2 padded pocket at the bottom right.
(7)
Stitch AR2 power cable sleeve to harness/container assembly seam that secures
the reserve compartment side panel and top to back panel as follows:
NOTE
Ensure reserve container flap is clear of sewing area.
17 ½-IN.
1/2-IN.
7 1/2-IN
Binding Tape
Top
