TM 10-1670-293-23&P
0011 00
Change 1
0011 00-30
NOTE
A packing paddle may be used to aid in tying the breakcord tie.
Remove the packing paddle after completing the tie.
5. Secure the ends of the cotton webbing, over the buffer loop, with a surgeons knot and locking knot.
Allow approximately a 3-inch loop between the static line buffer loop and the bridle loop. Trim the
ends to approximately 2-inches.
6. Rigger check number 3.
STOWING THE CANOPY
Proceed to stow the canopy as follows:
1. Release tension and unhook the bridle loop from the apex hook. Hold the deployment bag open with
the right hand and grasp the canopy near the apex. Place the apex of the canopy into the upper right
corner of the deployment bag.
2. Grasp the canopy with the left hand, approximately the width of the deployment bag, and place the
second stow in the upper left corner.
3. Continue stowing the canopy, in alternating sides of the deployment bag, until the lower lateral band
and the anti-inversion net are reached.