TM 10-1670-293-23&P
0011 00
0011 00-33
Change 1
CLOSING THE DEPLOMENT BAG AND STOWING THE SUSPENSION LINES
After the canopy stow has been completed, continue as follows:
1. Pull the suspension lines over the top center of the deployment bag; fold the side flaps of the
deployment bag over the stowed canopy anti-inversion net and fold the locking stow panel over the
side flaps. Insert the locking stow loops and connector link tie loops through the slots in the locking
stow panel.
2. Insert the stow hooks in the locking stow loop hoods to hold the deployment bag closed. Insert a
packing paddle through the connector link tie loops and lay the deployment bag down.
3. Grasp all the suspension lines and form a loop that reaches from the center of the deployment bag to
2-inches beyond the hood of the locking stow loop.