TM 10-1670-293-23&P
0011 00
0011 00-37
Change 1
11. Rigger check number 4.
12. Rotate the deployment bag one quarter-turn clockwise.
13. Grasp the suspension line, approximately the width of the deployment bag; slide the
bag on the table and form the second regular stow in the upper left corner of the bag.
14. Using a stow hook, make a second regular stow in the upper left corner.
15. Continue alternating the stows from right to left until approximately 8- to 10-inches of suspension lines
are left unstowed.