ARMY TM 10-1670-294-23&P
AIR FORCE T.O. 13C5-33-2
NAVY NAVAIR 13-1-34
2-23. Vent Reinforcement (Upper Lateral Band) (cont.).
(4)
Center the webbing length over the damaged area and secure the splice material by making four rows
of continuous stitching along the full length of the splice. Overstitch each webbing end by 1/2 Inch.
Stitching will be made using the stitching specifics in the applicable item equipment publication.
(5)
Reattach the vent line ends removed in (2) above by restitching according to original construction
details, using the stitching specified In the applicable item equipment publication.
Figure 2-40. Upper Lateral Band Splicing Details.
2-62