ARMY TM 10-1670-294-23&P
AIR FORCE T.O. 13C5-33-2
NAVY NAVAIR 13-1-34
2-24. Gore (cont.)
(6)
Remove push pins.
(7)
Sew each vertical ribbon with three rows of stitching using a light duty sewing machine and size E
thread, (A, figure 2-41).
(8)
Cut stitching along inside of radial ribbon piles where damaged area has been removed.
(9)
Position the constructed section with vertical ribbons alined on the inside and outside of canopy.
Secure vertical ribbon ends to canopy with three rows of stitching using a light duty sewing machine
and size E thread. Overstitch ends 1 Inch.
(10)
Position horizontal ribbons between the radial ribbon plies and secure with four rows of stitching using a
light duty sewing machine and size E thread. Lock stitch each row 2 inches.
2-64