TM 10-1670-299-20&P
TO 14D1-2-470-2
NAVAIR 13-1-41
SECTION II. MAINTENANCE ALLOCATION CHART
FOR PERSONNEL TROOP PARACHUTE
SYSTEM ANCILLARY EQUIPMENT (CONTINUED)
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
GROUP
COMPONENT/
MAINTENANCE
UNIT
DS
GS
DEPOT
TOOLS AND
NUMBER
ASSEMBLY
FUNCTION
C
O
F
H
D
EQUIPMENT
REMARKS
09
Jump Pack, Stinger
Inspect
0.2
Missile
Repair
0.5
1,2,3
A,B
Replace
0.2
10
Release Parachute
Inspect
0.2
Individual Equipment
Repair
0.5
1,2,3
A,B
Replace
0.2
11
Container, Aerial
Inspect
0.2
Delivery, General
Repair
0.5
1,2,3
A,B
Purpose, Individual
Equipment
Replace
0.2
1101
Container
Inspect
0.2
Repair
0.5
1,2,3
A,B
Replace
0.2
1102
Harness and Body
Inspect
0.2
Assembly
Repair
0.5
1,2,3
A,B
Replace
0.2
1103
Restraint Assembly,
Inspect
0.2
Horizontal
Repair
0.5
1,2,3
A,B
Replace
0.2
12
Container, Aerial
Inspect
0.2
Delivery Weapon and
Repair
0.5
1,2,3
A,B
Equipment, Adjustable
Replace
0.2
1201
Outer Padded Assembly
Inspect
0.2
Repair
0.5
1,2,3
A,B
Replace
0.2
1202
Outer Cap Assembly
Inspect
0.2
Repair
0.5
1,2,3
A,B
Replace
0.2
B-8
