TM 10-1670-299-20&P
TO 14D1-2-470-2
NAVAIR 13-1-41
SECTION II. MAINTENANCE ALLOCATION CHART
FOR PERSONNEL TROOP PARACHUTE
SYSTEM ANCILLARY EQUIPMENT (CONTINUED)
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
GROUP
COMPONENT/
MAINTENANCE
UNIT
DS
GS
DEPOT
TOOLS AND
NUMBER
ASSEMBLY
FUNCTION
C
O
F
H
D
EQUIPMENT
REMARKS
1203
Lower Cap Assembly
Inspect
0.2
Repair
0.5
1,2,3
A,B
Replace
0.2
1204
Upper Bridle Assembly
Inspect
0.2
Repair
0.5
1,2,3
A,B
Replace
0.2
1205
Lowering Line
Inspect
0.2
Repair
0.5
1,2,3
A,B
Replace
0.2
SECTION III. TOOLS AND TEST EQUIPMENT REQUIREMENTS
FOR PERSONNEL TROOP PARACHUTE SYSTEM ANCILLARY EQUIPMENT
TOOL OR TEST
MAINTENANCE
NOMENCLATURE
NATIONAUNATO
TOOL NUMBER
EQUIPMENT
CATEGORY
STOCK NUMBER
REF CODE
1
0
Knife
5110-00-162-2205
2
0
Shears
5110-00-223-6370
3
0
Compressing Tool
5120-00-323-2296
4
0
Cutter, Cable
5110-00-516-4217
5
0
Screwdriver
5120-00-278-1283
SECTION IV. REMARKS FOR PERSONNEL TROOP PARACHUTE
SYSTEM ANCILLARY EQUIPMENT
REFERENCE
REMARKS
CODE
A
Technical/Rigger Inspection Required
B
Restitching only
B-9/(B-10 Blank)
