TM 10-1670-299-20&P
TO 14D1-2-470-2
NAVAIR 13-1-41
2-19. HARNESS, SINGLE POINT RELEASE.
This task covers:
a. Inspect
c. Replace
b. Repair
INITIAL SETUP
Tools:
Knife, Item 1, Section III, Appendix B
Shears, Item 2, Section III, Appendix B
Compressing Tool, Item 3, Section III Appendix B
Cutter, Cable, Item 4, Section III Appendix B
Materials/Parts:
Cord, nylon, Item 9, Appendix D
Grommet, Spur type. Type III, Item 14, Appendix D
Nylon Cord, Type III, Item 9, Appendix D
Tape, fastener, hook, Item 25, Appendix D
Tape, fastener, pile, Item 27, Appendix D
Thread, nylon, size 3, Item 35, Appendix D
Thread, nylon, size E, Item 36, Appendix D
Thread, nylon, size FF, Item 37, Appendix D
Webbing, tubular, nylon. Item 50, Appendix D
Webbing, nylon, Item 45, Appendix D
Webbing, nylon, Type IV, Item 46, Appendix D
Wire, steel, Item 60, Appendix D
General Safety Requirements:
Read, understand, and follow warnings, cautions and notes.
Equipment Condition:
The harness assembly should be clean and dry. Place assembly on worktable.
INSPECT
Perform a before and after repair rigger/technical inspection of the lowering line as outlined in paragraph 2-14.
2-64