2-6. Operating Procedures - Continued
b.
Jumpmaster Duties - Continued
(b)
Loading of Combined ARABS and Payload into Aircraft.
1.
Arrange the equipment so that it can be loaded into the
aircraft in the opposite order of exit, with static lines and
drogue deployment bags facing toward the front of the
aircraft.
2.
Brief all personnel involved in loading operations (to
include the Air Force crew) in the proper handling of
rigged ARABS payloads.
3.
Perform a final inspection of the rigging, insuring that all
payload connector straps are secure, antennae are free
and clear under the AGU, and that the appropriate
number of safety pins and flags are present in their slots
in the Log Record Book pocket. Ensure that all channel
and AGU numbers recorded on the channel select
access panels are correct according to the load plan.
2-47