TM 10-1670-327-23&P
0005 00
1
3
Left
Right
Group
Group
2
Figure 2. Reattaching Connector Links.
Position Control Lines on Main Parachute. For new
MC-6 parachutes being placed in-service and in-
serviced parachutes, position control lines as follows:
1. Ensure that all ten upper control lines (five left side, five right side) and four guide rings (two left side,
two right side) are routed correctly and are free and clear.
2. Ensure that all four middle control lines (two left side, two right side) are free and clear, and that the
four control line limiters (two left side, two right side) are routed and attached correctly.
3. Ensure the two lower control lines (one left, one right) (figure 3, item 1) are free and clear in the
canopy.
1
Figure 3. Ensuring Lower Control Lines are Free and Clear.
4. Trace the lower control lines (left and right) (figure 4, item 1) down to the risers end (figure 4, item 2)
ensure that the lower control lines are free and clear from suspension lines and are routed to the
outside of the tension bar (figure 4, item 3).
0005 00-3