TM 10-1670-327-23&P
0005 00
4. Unit and Direct Support Repair and Inspection Data. When a parachute canopy assembly is initially
received from a supply source, and a technical/rigger-type inspection is performed, the inspection
accomplishment will be documented on the Unit and Intermediate Repair and Inspection Data page of
the individual parachute log record. Additional entries will also be made on this page each time the
canopy assembly is repaired, or is administered an inspection, in compliance with a Safety-of-Use-
Message (SOUM), Ground Precautionary Message (GPM) or a Maintenance Advisory Message
(MAM). The page completion criteria are as follows:
a. Type of repair. Enter the type of repair, completion of initial inspection, repair accomplishment,
SOUM, GPM or MAM inspection compliance.
b. Inspection by. The individual, who accomplished the inspection required, will sign this entry with
last name.
c.
Unit. Enter the unit designation responsible for performing the type of repair.
d. Date. Enter the day, month, and year the repair was performed.
1
2
3
Legend
1. Completion Of Initial Inspection
2. Repair Accomplishment
3. SOUM, GPM, or MAM Inspection Compliance
Figure 17. Unit and Direct Support Repair and Inspection Data.
5. Note page. A page is provided at the back of a parachute log record to accommodate recording
additional data pertinent to the serviceability of a parachute canopy assembly. This shall also include
the month and year the item was placed in service.
0005 00-11