TM 10-1670-327-23&P
0012 00
INSPECT - Continued
In-process Rigger Checks- MC-6 Main Parachute
1. After Proper Layout
Remove inversion from canopy
Remove suspension line turns, tangles, and twists
Assemble canopy release assemblies
Control lines to the inside
Place harness in proper layout
Bridle loop to left (box stitch)
Centering lines & line 28 cleared
2. After Gore Folding
Dress upper lateral band
Apply first tension
Fold gores
Apply second tension
Rough dress canopy
Subdivide canopy, dress bottom gore
Dress lower lateral band and net
Dress modifications and clear upper control lines
Clear air channel position control lines
3. After Long Fold And Breakcord Tie
Fold right group
Fold left over right group
Longfold proper width (rollback)
Breakcord tie
4.Stowing Canopy & 1st Regular Stow
Stow canopy and net in bag (Maintaining group separation)
Move tension plate forward (Control lines even with suspension lines)
First locking stow
Second locking stow
Flatten D-bag
First regular stow
5. Stowing Lines & Connector Link Ties
Slack in suspension line stows
Stow loops even with edge
Rolled stow loops
Remove stow hooks
Route connector link ties
Tie connector links
Correct log book entry (D-bag #)
6. After Pack Closing
Center pack on harness
Fold riser roll D-bag
Position curved pin
Pack closing (Left, Right, Bottom, Top)
0012 00-2