TM 10-1670-327-23&P
0013 00
INSPECT - Continued
In-process Rigger Checks Reserve Parachute
1. After Proper Layout
Packtray in proper layout (connector snaps even with w/ bottom edge of packtray)
Two riser stows
Barrel nut on connector links inside/tightened towards the packtray 1/4 turn
4 line (1 - 20 top) (10 11 bottom)
All apex loops retained by tension device
Apex tie pre-positioned
Skirts assist ties present
Ejector spring compressed
Extractor secured to apex tie loops
2. After Gore Folding (Flat Fold)
Apply first tension
Fold gores
Apply second tension
Rough dress canopy
Skirt assist lines Left/Right groups in line separator, suspension lines routed to the outside
Left/Right
Air channel is clear, 20 is on top
Scoops are dressed and tied correctly
3. After Long Fold
45 degree skirt fold Left/Right
Fold right group over left group 3 inches over air channel
Scoops long folded to apex
4. After First Regular Stow
Risers completely stowed ( top & bottom)
Note retainer bands between the 1 and 2 riser stows
Connector links in the middle of the pack tray
First stow to bottom right, 3-inch running end away
5. After Suspension Lines Are Stowed
12 stows on the packtray, 6 on the Left/Right
3 free stows utilizing 1-inch retainer bands, 1 on the Left/Right before Iast stow, milk the skirt
assist lines away from the canopy placing retainer band just below bartacks
12-inch of suspension lines remaining
Apex tie secured
6. After Extractor Parachute Position
Ensure all folds are correct
Ejector spring and extractor positioned
Extractor parachute positioned
7. After Temporary Closing
Position extractor cap
Side closing flaps correct (Left/Right)
Remove compresson rod
8. After Curved Pins Are Inserted
Left/Right pack tray tabs tucked
Close top / bottom closing flaps
0013 00-2