TM 10-1670-280-23&P 0012 00
0012 00-16
e. While holding line 60 in position in the line separator, pick up the left suspension line group and throw
the left group of gores and lines over the folded right group of gores and lines.
f.
Beginning with line 59, one packer passes each line in the left group to a second packer who feeds
the line and reefing ring to a third packer. The third packer threads the left running end of the reefing
line through each reefing ring.
g. After each reefing ring is threaded, the second packer will use a leg to guide the suspension line into
the left slot of the line separator.
h. Continue the gore folding process until lines 60 through 1 are reefed and in the left slot of the line
separator and the gores between each line are folded.
i.
From left to right, pass one end of the second reefing line securing tie through the hole in the reefing
line cutter at line 1 and center the webbing length.