TM 10-1670-265-12&P
T.O. 13C7-1-21
4-21. G-12E - SERVICE (Cont)
4-21
PACKING (Cont.)
3.
Servicing the canopy vent (cont).
e.
Extend the opposite end of the cloth down toward the inside of the vent lines and around both vent line
groups to serve the vent lines.
f.
At a point 1 inch back from each outside edge of the vent line serving cloth, secure each end by making a tie
g.
Secure each tie with a surgeon's knot and a locking knot. Trim tie ends to 2-inches.
GO TO NEXT PAGE
4-47