TM 10-1670-265-12&P
T.O. 13C7-1-21
4-21. G-12E - SERVICE (Cont)
4-21
PACKING (Cont.)
6.
Folding the gores (cont).
m.
Turn fan on.
n.
The left gore goup is folded in the same manner as the right group, rigger number 1 passes line 31 to a
second man who places the line on top of line 92 in the left slot of the line separator.
o.
Insure that while placing line 31 into the line separator, the gore between lines 31 and 32 deflates and lies flat
in a folded fashion.
p.
Fold the remainder of the left gore group, until all of the suspension lines of the left group are in the left slot
of the line separator.
q.
Turn fan off.
r.
Remove the running end of the canopy center line from within the canopy skirt.
s.
Place the center line in the right slot of the line separator.
t.
Extend the center line length along the length of the right suspension line group.
u.
Insure that the canopy skirt does not become disarranged during removal of the center line.
v.
Insure that all twists are removed from the portion of the center line extending below the canopy skirt.
GO TO NEXT PAGE
4-55