TM 10-1670-265-13&P
T.O. 13C7-1-12
4-21. G-12E - SERVICE (Cont)
4-21
PACKING (Cont.)
7.
Effecting canopy vent pull-down.
a.
Release tension device and remove the canopy bridle loop from the stationary post.
b.
Riggers number 2 and 3 position themselves on each side of the skirt of the folded canopy and raise the top
center gore.
c.
Rigger number 1 grasps the free end loop of the center line and slowly pulls the center line toward the 3/4-
inch shackle (clevis).
d.
Riggers 2 and 3 insure that the folded canopy gores do not become disarranged while the canopy vent is
being pulled through the inside of the canopy, toward the canopy skirt.
GO TO NEXT PAGE
4-56