TM 10-1670-265-12&P
T.O. 13C7-1-12
4-21. G-12E - SERVICE (Cont)
4-21
PACKING (Cont.)
7.
Effecting canopy vent pull-down (cont).
e.
Rigger number 1 stops pulling on the center line when the served portion of the canopy vent lines becomes
alined with the canopy skirt.
f.
Riggers 2 and 3 lay the top center gore back down on the canopy, insuring that the gore is dressed along the
lower edge and each side.
g.
Place the center line on top of the right suspension line group. The running end loop of the center line
should be located 6 to 9 inches below the 3/4-inch clevis.
h.
Remove tension device from clevis.
GO TO NEXT PAGE
4-57