TM 10-1670-269-23&P
0004 00
0004 00-5
2. Inside Back Cover. Entries may be continued on the inside back cover, if necessary.
3. Modification Work Order (MWO) compliance record page. When a modification is performed on a
parachute canopy, the following entries will be made on the Modification Work Order Compliance
Record pages of the Log Record.
h. MWO Number. Enter the publication number and date of the Modification Work Order, which
describes the MWO.
i.
MWO Title. Enter a short, abbreviated title extracted from the MWO prescribing the work.
j.
Modified By. Enter the last name of the individual who has performed the modification. If the
original log record for the parachute has been lost, and it has been ascertained through
inspection that a particular modification has been accomplished, the entry for this column will be
C/W Complied With, which signifies the applicable MWO has been complied with.
Enlarge Orifice
Enlarge Orifice