TM 10-1670-277-23&P 0011 00
0011 00-24
g. Rigger check number 4.
6. Stowing the suspension lines.
NOTE
When making suspension line stows ensure stows do not exceed the
width of the deployment bag. All suspension line stows on the 28-foot-
diameter cargo extraction parachute will be secured with 1-turn double,
type I ¼-inch cotton webbing and tied with a surgeons knot and locking
knot.
a. To the right of secured center bag tie loops, form a loop in suspension lines and make the first
suspension line stow at the upper right corner of the deployment bag suspension line stowage flap.
Secure stow with the previously installed type I ¼-inch cotton webbing.
b. Extend suspension lines to upper left corner of stowage flap, form a loop in the suspension line and
secure stow with previously installed type I ¼-inch cotton webbing.
c. Using procedures in (a) and (b) above, continue stowing suspension lines on stowage flap to a point
within ten-inches of suspension line connector link assemblies. Make last stow at the lower right side
of the stowage flap.
