TM 10-1670-277-23&P 0011 00 0011 00-25 d. Rigger check number 5. 7. Closing the deployment bag. a. Position suspension line connector link assemblies on inside center top of deployment bag. Extend adapter web from left side. b. Cut an 11-foot length of type I, ¼-inch cotton webbing, fold in half twice forming a 2-foot 9-inch piece. c. Girth hitch the 1-turn double, type I, ¼-inch cotton webbing around the adapter web above the connector links. Route one free end through the grommet (inside to outside) on the right side of the deployment bag forming an 8-inch loop. Secure with a surgeon’s knot and locking knot. d. Cut two 24-inch lengths of type I ¼-inch cotton webbing. S-fold the adapter web approximately the width of the storage flap and secure each S-fold with two, 24-inch lengths, 1-turn double, type I, ¼-inch cotton webbing, tying a surgeon’s knot and locking knot. e. S-fold the remainder of the adapter webbing and secure it with a 1-turn double, 24-inch length of type I, ¼-inch cotton webbing with a surgeon’s knot and locking knot. Grommet
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business