ARMY TM 10-1670-281-23&P
AIR FORCE T.O. 13C5-32-2
NAVY NAVAIR 13-1-32
(12) Packing procedures using the G 12E deployment bag.
(a) Cut two 18 inch lengths of 1/4 inch, type I cotton webbing, with a girth hitch secure one
webbing length to each stow loop on the center of the stowage panel.
(b) Fold the locking slot over the stowed canopy and insert the locking loops through the
respective locking slots. Ensure the first webbing length ends installed on the center stow bop
are extended through the center locking slot (figure 2-95.1).
Figure 2-95.1. Bag Closing, G-12E
(c) Cut a 36 inch length of 1/2 inch wide tubular nylon webbing or equivalent, for use as a
packing aid. Double the webbing length and make an overhand knot in the aligned webbing
ends.
(d) Using the double webbing, encircle the suspension lines and make a girth hitch in the
webbing. Thread the packing aid knotted end through the right locking stow loop and make
the first locking stow by pulling the webbing and suspension lines through the locking stow
until the edge of the stow is aligned with the edge of the locking slot flap. Remove the
packing aid.
Change 4
2-98.1
