ARMY TM 10-1670-281-23&P
AIR FORCE T.O. 13C5-32-2
NAVY NAVAIR 13-1-32
(f) Secure the locking stows by tieing the suspension line lengths to the first center stow loop on
the stowage panel using the webbing length installed in step (a), above. Make the tie with the
surgeon's knot and locking knot Trim the ends 2 inches (figure 2-95.3).
Figure 2-95.3. Securing Tie Completed, G-12E
(13) Stowing the suspension lines and suspension risers.
(a) Cut a minimum of twenty-four 18 inch lengths of 1/4 inch wide, type I cotton webbing, for use
as suspension line stow lines.
Change 4
2-98.3